Project/Location
|
Client
|
Division
|
Year
|
Description
|
J-Lay System/ Mechanical Connector |
SBM |
Product Development |
2006-Pres. |
GMC is providing the conceptual design of a J-lay system and the detailed engineering for the development of a mechanical connector |
32" Pipeline Installation , Varenday, Russia |
MRTS |
Shallow Water |
2005-07 |
GMC provided the management, engineering, supervisory personnel and key members of the barge crew to engineer and install two 32" pipelines in water depth of 20m. |
48" Installation and Barge Modification, Baideraskaya Bay, Russia |
MRTS |
Shallow Water |
2007-Pres. |
GMC provided the management, engineering, supervisory personnel and key members of the barge crew to engineer and install a 48" gas pipeline in water depth of 26m. GMC also provided equipment and engineering for refurbishment of the barge "Defender" |
Blind Faith Field development project, G.O.M |
Williams |
Deep Water |
2003-Pres. |
GMC is supplying consulting and installation services |
Global G1200 vessel |
Global |
Deep Water |
2007-Pres. |
GMC is supplying pipelay equipment for the new deepwater Global G1200 vessel. GMC is also designing the VLS (Vertical Lay Systems) for the DP vessels REM and Aker. |
Barge 332 Upgrade |
Global |
Offshore Equipment |
2007-Pres. |
GMC is supplying pipelay equipment for the upgrade on the Barge 332. |
DP vessels REM and Aker. |
Global |
Engineering |
2007-Pres. |
GMC is designing the VLS (Vertical Lay Systems) for the DP vessels REM and Aker. |
Barge 801 Stinger Design |
Con-Dive |
Engineering |
2007-Pres. |
GMC is designing the stinger for the Barge 801 |
52" waterline installation |
Sydney Water Corporation |
Shallow Water |
2008-Pres |
GMC is providing consulting for all phases of the project and Barge Superintendents responsible for the operations of the lay barge spread |
Con-Dive Goliath Vessel |
Con-Dive |
Deep Water |
2007-Pres. |
GMC is providing all pipelay equipment for the deepwater pipe layer Goliath |
Eureka return to production project, off shore of the California coast |
Pacific Energy |
Deep Water |
2007-Pres |
Design of all pipe handling equipment, modifications to platforms and development of installation procedure. |
Thunder Horse project, G.O.M |
BP |
Deep Water |
2002-Pres |
GMC is supplying consulting and installation services for the installation of PLEMs, PLETs, SCRs, and jumper installations |
Various
North Sea, Asia |
EMC Ltd |
Shallow Water |
2001-02 |
Provision of barge crew for Semac 1 laybarge.Incl. Automatic welding
technicians, Barge foreman and Deck crew, Tower foreman and Tower crew. |
Various
Gulf of Mexico, North Sea, Asia |
EMC Ltd |
Shallow Water |
2001-02 |
Provision of Barge Crew for Castoro 10 laybarge.Incl. Welder foreman
and welding crew, Mechanics and Electricians, Crane operators. |
Aspen Subsea Development
Gulf of Mexico |
BP |
Shallow Water |
20002 |
Design and build umbilical lay system with HIP barge concept. Articulated
stinger inspection vehicle system. |
Dong Fang 1-1
South China Sea |
CNNOC |
Shallow Water |
2002-03 |
Provision of Offshore Consultants on the Lan Jiang Laybarge. Including
Barge Superintendent, Installation Engineers. |
Eastchester Extension
Long Island, NY |
Iroquios Gas Company |
Shallow Water |
2002-03 |
Client supervision of installation procedure for marine contractors.
Hydrographic survey and pipeline route designations. Pipelay analysis
for trenching (dry and wet) with Sea Titan. |
Varoius
Gulf of Mexico |
Horizon |
Shallow Water |
2002-04 |
Provision of Trenching Crew on the Gulf Horizon and Atlantic HorizonIncl.
Trenching Superintendent and crew, Installation engineer and analyst,
Maintenance technicians. |
Galata
Black Sea, Bulgaria |
Petreco |
Shallow Water |
2003-04 |
Design, mobilize and operate Shallow Water Laybarge for Bulgaria
first offshore pipeline. |
Various
Argentina |
McDermott |
Shallow Water |
2003-04 |
Provision of Supervisory crew on the DB 60 laybarge.Incl. Barge Superintendent,
Barge Foreman, Shore Approach Superintendent, Winch Technicians. |
RSPPM Mumbai High Field India |
ONGC |
Shallow Water |
2004-06 |
Engineering, Management & Supervision (EMS) for instalaltion of rigid pipelines
of 6" to 16" diameter and water depths 70 to 85m. |
Marlin
Brazil |
Petrobras |
Deep Water |
1996 |
Mobilize semi-submersible with modular j-lay tower. Install flowline
and SCR in 1000m of water to semi-submersible host. |
Kizomba A Block 14
Angola |
Exxon |
Deep Water |
2001-04 |
Client supervision of installation procedure for marine contractors.
HAZOP studies for FPSO and dry tree installations. Marine equipment inspections
for client safety procedure |
Various
Caspian Sea |
AIOCC |
Deep Water |
2002 |
Manufacture of a 200Te Pipe Tensioning & A/R System for the Ismail
Guseinov pipelay barge.Electric with integrated PLC controls, outfitted
for deepwater operation. |
Bonga FPSO
West Africa |
Stolt |
Deep Water |
2002-03 |
Design, build and operate SCR Chain Jacks for FPSO. |
Shell Nakika
Gulf of Mexico |
Technip-Coflexip |
Deep Water |
2002-03 |
Providing technical support for onshore welding and spooling of pipelines
for CSO Deep Blue on Technip NaKika project.Load out and transfer of pipe
materials to lay vessel Deep Blue. |
FPSO
|
ERHA |
Deep Water |
2004 |
375 Metric Tonne Chain Jack for SCR transfer system. Portable hang-off
system for multi-angular dynamic risers. |
| |
Clyde Petroleum |
Burial |
2000 |
Install & trench 8 km x 10" flexible line. |
Carina Aries
Argentina |
Total Fina Elf |
Burial |
2001-03 |
Feasibility and conceptual study for trenching 136km of 24-inch pipeline
on the Carina Aries Development project.Design and manage shore approach
work. Pipelay analysis for trenching (dry and wet) with MTM 100. |
Eastchester Extension
Long Island, NY |
Iroquios Gas Company |
Burial |
2002-03 |
Main contractor Horizon Offshore. Plowed 30 km x 24", Bronx to Long
Island Gas line. Developed new build plow for Horizon, wrote procedures,
supervised build & on site preparation; provision of plowmaster & crew
for all plowing ops. |
East Coast USA
|
Horizon |
Burial |
2002-04 |
Design, build and operate a subsea lightweight plow. |
Argentina
|
BP |
Burial |
2002-04 |
Design, refurbish and upgrade deepwater diverless plow and operate. |
Boston
|
Duke Energy |
Burial |
2002-04 |
Plowed 30km x 30". Main contractor Horizon Offshore in 2 phases.
Preparation of plow from storage, provision of plowmaster & crew. |