Projects > Project Archive

The projects that GMC Limited have performed are all listed below. To find out more about our featured projects please click on any of the links below.


Project/Location


Client


Division


Year


Description

J-Lay System/ Mechanical Connector

SBM

Product Development

2006-Pres.

GMC is providing the conceptual design of a J-lay system and the detailed engineering for the development of a mechanical connector

32" Pipeline Installation , Varenday, Russia

MRTS

Shallow Water

2005-07

GMC provided the management, engineering, supervisory personnel and key members of the barge crew to engineer and install two 32" pipelines in water depth of 20m.

48" Installation and Barge Modification, Baideraskaya Bay, Russia

MRTS

Shallow Water

2007-Pres.

GMC provided the management, engineering, supervisory personnel and key members of the barge crew to engineer and install a 48" gas pipeline in water depth of 26m. GMC also provided equipment and engineering for refurbishment of the barge "Defender"

Blind Faith Field development project, G.O.M

Williams

Deep Water

2003-Pres.

GMC is supplying consulting and installation services

Global G1200 vessel

Global

Deep Water

2007-Pres.

GMC is supplying pipelay equipment for the new deepwater Global G1200 vessel. GMC is also designing the VLS (Vertical Lay Systems) for the DP vessels REM and Aker.

Barge 332 Upgrade

Global

Offshore Equipment

2007-Pres.

GMC is supplying pipelay equipment for the upgrade on the Barge 332.

DP vessels REM and Aker.

Global

Engineering

2007-Pres.

GMC is designing the VLS (Vertical Lay Systems) for the DP vessels REM and Aker.

Barge 801 Stinger Design

Con-Dive

Engineering

2007-Pres.

GMC is designing the stinger for the Barge 801

52" waterline installation

Sydney Water Corporation

Shallow Water

2008-Pres

GMC is providing consulting for all phases of the project and Barge Superintendents responsible for the operations of the lay barge spread

Con-Dive Goliath Vessel

Con-Dive

Deep Water

2007-Pres.

GMC is providing all pipelay equipment for the deepwater pipe layer Goliath

Eureka return to production project, off shore of the California coast

Pacific Energy

Deep Water

2007-Pres

Design of all pipe handling equipment, modifications to platforms and development of installation procedure.

Thunder Horse project, G.O.M

BP

Deep Water

2002-Pres

GMC is supplying consulting and installation services for the installation of PLEMs, PLETs, SCRs, and jumper installations

Various
North Sea, Asia

EMC Ltd

Shallow Water

2001-02

Provision of barge crew for Semac 1 laybarge.Incl. Automatic welding technicians, Barge foreman and Deck crew, Tower foreman and Tower crew.

Various
Gulf of Mexico, North Sea, Asia

EMC Ltd

Shallow Water

2001-02

Provision of Barge Crew for Castoro 10 laybarge.Incl. Welder foreman and welding crew, Mechanics and Electricians, Crane operators.

Aspen Subsea Development
Gulf of Mexico

BP

Shallow Water

20002

Design and build umbilical lay system with HIP barge concept. Articulated stinger inspection vehicle system.

Dong Fang 1-1
South China Sea

CNNOC

Shallow Water

2002-03

Provision of Offshore Consultants on the Lan Jiang Laybarge. Including Barge Superintendent, Installation Engineers.

Eastchester Extension
Long Island, NY

Iroquios Gas Company

Shallow Water

2002-03

Client supervision of installation procedure for marine contractors. Hydrographic survey and pipeline route designations. Pipelay analysis for trenching (dry and wet) with Sea Titan.

Varoius
Gulf of Mexico

Horizon

Shallow Water

2002-04

Provision of Trenching Crew on the Gulf Horizon and Atlantic HorizonIncl. Trenching Superintendent and crew, Installation engineer and analyst, Maintenance technicians.

Galata
Black Sea, Bulgaria

Petreco

Shallow Water

2003-04

Design, mobilize and operate Shallow Water Laybarge for Bulgaria first offshore pipeline.

Various
Argentina

McDermott

Shallow Water

2003-04

Provision of Supervisory crew on the DB 60 laybarge.Incl. Barge Superintendent, Barge Foreman, Shore Approach Superintendent, Winch Technicians.

RSPPM
Mumbai High Field
India

ONGC

Shallow Water

2004-06

Engineering, Management & Supervision (EMS) for instalaltion of rigid pipelines
of 6" to 16" diameter and water depths 70 to 85m.

Marlin
Brazil

Petrobras

Deep Water

1996

Mobilize semi-submersible with modular j-lay tower. Install flowline and SCR in 1000m of water to semi-submersible host.

Kizomba A Block 14
Angola

Exxon

Deep Water

2001-04

Client supervision of installation procedure for marine contractors. HAZOP studies for FPSO and dry tree installations. Marine equipment inspections for client safety procedure

Various
Caspian Sea

AIOCC

Deep Water

2002

Manufacture of a 200Te Pipe Tensioning & A/R System for the Ismail Guseinov pipelay barge.Electric with integrated PLC controls, outfitted for deepwater operation.

Bonga FPSO
West Africa

Stolt

Deep Water

2002-03

Design, build and operate SCR Chain Jacks for FPSO.

Shell Nakika
Gulf of Mexico

Technip-Coflexip

Deep Water

2002-03

Providing technical support for onshore welding and spooling of pipelines for CSO Deep Blue on Technip NaKika project.Load out and transfer of pipe materials to lay vessel Deep Blue.

FPSO

ERHA

Deep Water

2004

375 Metric Tonne Chain Jack for SCR transfer system. Portable hang-off system for multi-angular dynamic risers.

Southern North Sea

Clyde Petroleum

Burial

2000

Install & trench 8 km x 10" flexible line.

Carina Aries
Argentina

Total Fina Elf

Burial

2001-03

Feasibility and conceptual study for trenching 136km of 24-inch pipeline on the Carina Aries Development project.Design and manage shore approach work. Pipelay analysis for trenching (dry and wet) with MTM 100.

Eastchester Extension
Long Island, NY

Iroquios Gas Company

Burial

2002-03

Main contractor Horizon Offshore. Plowed 30 km x 24", Bronx to Long Island Gas line. Developed new build plow for Horizon, wrote procedures, supervised build & on site preparation; provision of plowmaster & crew for all plowing ops.

East Coast USA

Horizon

Burial

2002-04

Design, build and operate a subsea lightweight plow.

Argentina

BP

Burial

2002-04

Design, refurbish and upgrade deepwater diverless plow and operate.

Boston

Duke Energy

Burial

2002-04

Plowed 30km x 30". Main contractor Horizon Offshore in 2 phases. Preparation of plow from storage, provision of plowmaster & crew.